Maxus defines 11 Quarry targets, but historic gaps still limit resource modelling
Bullseye’s first planned campaign must reconcile its targeting ambitions with drilling and assay records that leave key parts of the picture incomplete.

operations.newmont.com
Why it matters: The Quarry study offers a framework for planning exploration, but historical data gaps still stand between Bullseye’s targets and a defensible resource model.
11 preliminary targets — geological areas identified to guide future drilling at Quarry.
12 deposits — international polymetallic examples reviewed to inform initial drill-spacing criteria.
2,632 hectares — the area covered by the project in northern British Columbia.
Maxus Mining has completed a technical study at its Quarry project in northern British Columbia, defining 11 preliminary geological targets and initial drill-spacing criteria for a potential first campaign at the historic Bullseye zone. The work by Understood Mineral Resources (UMR) does not support a quantitative resource model: gaps in historical assay records and limited drill coverage remain unresolved.
UMR reviewed geological, drilling and assay information from the Beveley area, which includes Bullseye. It used records of silver, lead and zinc mineralization, with possible antimony, to create interpreted three-dimensional wireframes and prioritize areas for exploration. The wireframes are targets, not a mineral resource estimate, and do not establish that mineralization is continuous across their full extent.
Drill-spacing guidance is preliminary
To develop initial drilling references, UMR assessed 12 international polymetallic deposits with comparable mineralization. The review informed preliminary spacing criteria associated with Indicated and Inferred resource categories, which Maxus may use in planning its first Quarry campaign. The company has not disclosed the recommended distances for either category.
Spacing alone cannot establish a resource classification. That requires sufficient, verified data and a geological and grade model prepared under applicable standards. UMR identified incomplete assay records and limited drill coverage as constraints that currently prevent more detailed quantitative geological modelling and a preliminary resource estimate.
Maxus said it will use the study to refine its geological interpretation, check historical information where possible and assess confirmation, infill and expansion drilling. The work therefore sets out an initial planning basis, while leaving verification and additional drilling outstanding.
Historical Bullseye estimates carry qualification
Historical information cited for Quarry includes a 1978 estimate by engineer Keith C. Fahrni in a Suzie Mining Explorations document. It reported 99,781 tonnes grading 1.42% lead, 2.24% zinc and 36.3 g/t silver, described at the time as “indicated by drilling.” The document also reported 2.72 million tonnes grading 3.66% combined lead and zinc and 36.3 g/t silver across three zones.
Maxus cautions that the calculations lack sufficient documentation of assumptions, parameters and methods for assessment under current Canadian Institute of Mining, Metallurgy and Petroleum standards. The category assigned to the 2.72-million-tonne estimate was not specified; the historical phrase “indicated by drilling” is not directly comparable with current resource categories. The company does not treat these figures as current mineral resources or reserves.
Historical holes at Bullseye reportedly returned 23.6 metres grading 1.83% lead, 2.82% zinc and 56.2 g/t silver in hole 77-11, and 6.91 metres grading 2.42% lead, 2.43% zinc and 87.7 g/t silver in hole 80-66. These are drilled interval lengths, not known true widths, and the results have not been independently verified by Maxus qualified person Morgan Verge, a professional geologist.
Verification work remains ahead
Quarry covers 2,632 hectares north of the Osilinka River, between Tenakhi and Wasi creeks, about 46 kilometres northwest of Germansen Landing. At the former Quarry site, mineralized quartz veins occur in recrystallized and dolomitized Neoproterozoic Ingenika Group limestone. Documented minerals include sphalerite, galena, cerussite, chalcopyrite and boulangerite; stibnite has also been cited as a possibility.
Work needed to support a potential NI 43-101-compliant estimate includes compiling historical drill data, confirmation or twin drilling at appropriate spacing, validating hole locations and trajectories, density testing and modern analytical quality controls. A three-dimensional geological and grade model would also need to be developed and reviewed by a qualified person. UMR’s study provides initial guidance for that work, but does not replace the verification and drilling still required.
More in Resources
Foresea expands Brazil drilling business as its five owned rigs stay with Petrobras
Its Foz do Amazonas campaign adds an exploration front, while undisclosed contract-level figures leave the revenue mix opaque.
Argentina targets US$32.7 billion in copper and lithium exports, but can it build?
The forecast leans heavily on copper, but Argentina has yet to build the large-scale operating base needed to deliver it.
Antofagasta records 40-plus robberies as mining security extends beyond sites
Copper loads, power infrastructure and digital systems widen the exposure, but the reported counts do not show how many attacks succeeded.



