SUNDAY, NOVEMBER 22, 2026 · GLOBAL EDITION (EN) · EDICIÓN LATAM (ES)

Melkior starts 4,400-metre Quebec drilling campaign, but continuity remains unproven

Historical gold and copper-zinc intersections will guide tests across four areas where geophysical anomalies overlap.

Melkior starts 4,400-metre Quebec drilling campaign, but continuity remains unproven

Why it matters: The drilling will test whether historical gold and base-metal intersections connect into mineralized zones large enough to warrant further exploration.

By the numbers:
  • 4,465 metres — total drilling across the two planned phases

  • 12 holes — planned across the Beschefer East targets

  • 2.1 g/t gold over 5.4 metres — historical result from hole 1172-13-40

  • C$1.5 million — exploration spending commitment under Melkior’s option agreement with SOQUEM

Melkior Resources has started a diamond-drilling program at its Beschefer East project in Quebec, with 12 holes planned across two phases to test historical gold, copper, zinc and silver intersections and explore extensions of geophysical targets. The company describes the campaign as approximately 4,400 metres; the detailed phase totals add up to 4,465 metres.

The program began in November 2026 and is scheduled to continue through the Canadian winter of 2027. Quebec contractor Forage DCB Inc. has mobilized to the project, in the Abitibi North greenstone belt, about 90 kilometres west of Matagami and 100 kilometres north of La Sarre. The targets were selected where historical mineralized intersections coincide with magnetic, electromagnetic and induced-polarization anomalies.

First four holes test the B14 gold trend

The initial phase comprises four holes—BEE-20, BEE-39, BEE-40 and BEE-41—for approximately 1,400 metres. Planned depths range from 300 to 500 metres. The holes are intended to investigate a possible northern extension of the B14 gold trend along a north-south corridor identified by geophysical surveys.

Historical hole 1172-13-40 returned 2.1 g/t gold over 5.4 metres, including 0.9 metres at 7.9 g/t. Hole 1172-99-30 returned 2.03 g/t gold over 6.1 metres. These results support further testing, but do not establish the lateral or depth continuity of the mineralization. Melkior expects the initial drilling to take three to four weeks, with first laboratory results anticipated in the first quarter of 2027.

Winter program adds gold and base-metal targets

A second phase of eight holes, planned for the Canadian winter of 2027, totals approximately 3,065 metres. It will test the eastern extension of B14, the B26 trend associated with gold and base-metal mineralization, and other targets. Planned hole lengths range from approximately 250 to 700 metres.

Hole BEE-35 is intended to follow up a historical copper-zinc-silver intersection in hole H-1432-091, drilled by Noramco. That hole returned 24.4 metres grading 0.11% copper, 0.24% zinc and 0.90 g/t silver, including six metres at 0.61% copper, 0.30% zinc and 6.6 g/t silver. The historical result is an exploration intercept, not a mineral resource estimate. The company will use the new drilling to investigate the mineralization’s characteristics and continuity.

Holes BEE-13 and BEE-14 will test gold targets in graphitic sedimentary rocks near the contact between the Enjalran and Brouillan groups. Historical results there include 3.45 g/t gold over 1.5 metres and 3.37 g/t over 1.3 metres. Melkior is also evaluating whether geophysical and geological features at B26 could indicate a volcanogenic massive sulphide system, which can host copper, zinc, lead and precious metals.

Historical work provides context, not a defined resource

Beschefer East covers 2,906 hectares across 55 mineral exploration claims in the Selbaie mining district. From 1992 to 2012, SOQUEM completed more than 300 line-kilometres of geophysical surveys and drilled 11,200 metres in 42 holes. Melkior’s 2025 program added six holes totalling 1,050 metres in a previously undrilled central-eastern area. The company reported results including 5.1 g/t gold, 0.95% copper and 0.67% zinc over 0.9 metres, and 7.5 g/t gold over 1.3 metres.

Melkior is exploring the property under a June 2023 option agreement with SOQUEM that provides for the possibility of acquiring a 100% interest, subject to conditions. In March 2026, the parties extended the deadline to meet a cumulative C$1.5 million exploration-spending commitment to July 3, 2027. The commitment is separate from the current program, for which no total cost was disclosed.

Beschefer East remains at the exploration stage, with no defined reserves or confirmed economic viability. Drill core will be logged and sent to independent laboratories, with certified reference materials, duplicates and blanks included in the quality-control procedures. The planned drilling and assay results will determine whether the historical intersections support further exploration.