New Zealand reopens oil exploration, but permits do not unlock land access
A new small-scale gold category sits alongside a system in which land ownership and mineral rights can diverge.

reuters.com
Why it matters: New Zealand’s revised minerals regime changes which activities can be permitted, but companies must still secure land access and separate approvals before projects can proceed.
1991 — the year the Crown Minerals Act was enacted
4 minerals — petroleum, gold, silver and uranium belong to the Crown in their natural state
2025 — the year reforms removed the bar on new oil exploration applications and introduced Tier 3
New Zealand has reopened applications for petroleum exploration permits and created a new permit category for small-scale, non-commercial gold mining, but neither change gives a permit holder automatic access to land. The 2025 reforms updated the Crown Minerals Act 1991; companies still need to secure access and obtain approvals required under other laws.
The distinction matters because ownership of land does not necessarily include ownership of the minerals beneath it. Petroleum, gold, silver and uranium belong to the Crown in their natural state, including when the surface property is privately owned. Buying or leasing land therefore does not automatically transfer rights to those resources.
NZP&M administers permits across three activity stages
New Zealand Petroleum & Minerals (NZP&M), part of the Ministry of Business, Innovation and Employment, administers permits for prospecting, exploration and mining. Prospecting covers initial searches, exploration allows more detailed work to assess a resource, and mining permits relate to extraction.
Mining permits are also divided by scale and risk. Tier 1 covers more complex, higher-risk operations and carries more intensive oversight. Tier 2 includes lower-return industrial operations as well as small-scale or recreational activity. Introduced in 2025, Tier 3 provides a route for non-commercial, small-scale gold mining in riverbeds or on beaches.
The reforms also lifted the legal prohibition on applications for new petroleum exploration permits and changed permit and financial security rules. MBIE has linked the changes to investor confidence. Critics have objected to issues including mining on conservation land and the return of hydrocarbon exploration.
A permit is separate from permission to enter land
The 2025 Minerals Programme states that a permit does not grant access to any property or replace approvals required under other legislation, including resource management and conservation rules. On private land, permit holders must negotiate access with the owner or occupier through the applicable procedures. Terms, compensation, timing and rehabilitation measures remain to be resolved.
Access to public conservation land requires an agreement with its administrator, usually the Department of Conservation. The issue remains contested: parliamentary submissions in 2026 included calls for a moratorium, while industry representatives sought more predictable access rules.
The framework also includes Māori rights and Treaty-related instruments. Entry to Māori land designated wāhi tapu—sites of special spiritual significance to tangata whenua—requires the owner’s consent, even for activities with minimal impact. The programme records specific Treaty of Waitangi redress commitments, including minerals protocols and relationship agreements. Although the law requires consideration of Treaty principles, the scope of that requirement is debated; the framework does not establish an automatic veto for every iwi over every project.
Foreign investment can require another consent
A mining permit does not exempt foreign investors from the Overseas Investment Act 2005. Transactions involving sensitive land, including certain farmland, conservation areas, coastal land or seabed, or another regulated category, may require consent from the Overseas Investment Office, which is part of Land Information New Zealand. Where consent is required, it must be secured before the investment closes.
For a project to advance, a permit is only one part of the process. Land access, environmental approvals, relevant Māori participation and commitments, foreign investment consent where applicable, and eventual closure or decommissioning obligations remain separate considerations.
More in Resources
Black Cat adds 83 sq km at Kal East as Jones Find’s pit edge constrains plans
Historical drilling points southeast beyond the current tenure edge, but the added ground has yet to enter Jones Find’s mine planning.
Copper falls nearly 18% as US tariff bets cloud tightening supply
Metal moved into the United States ahead of possible duties could return to other markets even as mine and refined supply remain constrained.
Auren solar project targets Escondida, but grid exports remain undefined
The Antofagasta proposal pairs solar generation with batteries, but the filing does not state how long they can discharge.



