FRIDAY, NOVEMBER 27, 2026 · GLOBAL EDITION (EN) · EDICIÓN LATAM (ES)

Chile’s 1% copper-export exploration scenario leaves the funding model open

The hypothetical pool would target early-stage work, but export receipts are not automatically available to the state.

Chile’s 1% copper-export exploration scenario leaves the funding model open

riotimesonline.com

Why it matters: A sustained funding stream could expand Chile’s search for new deposits, but its value depends on attracting additional capital without treating company export revenue as public money.

By the numbers:
  • US$586.5 million — hypothetical annual exploration allocation based on 1% of 2025 copper exports.

  • US$206.5 million — Chile’s 2025 budget for initial exploration, according to Cochilco.

  • 12.7 million metres — estimated decade-long drilling capacity at a blended cost of US$277.20 per metre.

Chile could mobilise US$586.5 million a year for mineral exploration by allocating an amount equivalent to 1% of its 2025 copper export value, according to a hypothetical scenario based on Central Bank of Chile figures. The proposal has not been announced as a government programme. It would use the US$58.653 billion export total as a benchmark, not as money directly available to the state.

At that annual level, the scenario would amount to US$5.865 billion over 10 years if funding remained constant. Applying the same 1% calculation to each year’s exports from 2016 to 2025 produces a hypothetical total of US$4.159 billion.

The proposed pool would exceed initial exploration spending

Cochilco recorded a national exploration budget of US$874.7 million in 2025, the highest since 2013. Of that, US$206.5 million was assigned to initial exploration, compared with US$449.3 million for exploration at existing mines and US$218.9 million for advanced exploration and feasibility work.

If the proposed US$586.5 million were entirely additional, the national total would rise to US$1.461 billion, an increase of about 67%. The hypothetical pool would be 2.84 times the 2025 initial-exploration budget. Its proponents’ central premise is that more funding could be directed toward new districts rather than areas around established operations; neither the spending increase nor any resulting discoveries is assured.

Drilling would take only part of the budget

One illustrative allocation puts 60% of the annual pool, or US$351.9 million, toward drilling. The remainder would cover geophysics and geochemistry, geology and laboratories, logistics, permitting and environmental work, exploration technology, public geological information, administration and contingencies.

Using reference costs of US$210 per metre for reverse-circulation drilling and US$322 for diamond drilling, a 60:40 combination gives an estimated cost of US$277.20 per metre. At that rate, the drilling share could fund about 1.27 million metres a year, or 12.7 million metres over a decade. The estimate is illustrative: actual costs would vary with depth, location, geology and operating conditions, and deeper drilling can cost more per metre.

A proposed portfolio would spread the annual funding across early prospect evaluation, drilling campaigns and advanced resource-definition work. The model gives indicative allocations to 100 initial prospect programmes, 60 drilling campaigns and 30 advanced campaigns each year. These stages could involve the same prospect over time; the totals do not represent separate deposits or guaranteed discoveries.

The funding model remains unresolved

The export value of copper does not flow directly to government: mining companies use revenue to meet operating costs, investment, wages, financing obligations and taxes. The scenario therefore does not, by itself, establish a new tax or identify a funding source.

Options outlined include public funding for geological information and competitive programmes, private investment, partnerships involving Codelco or ENAMI, and co-financing that shares exploration risk. A 20% state contribution to the proposed pool would be about US$117.3 million a year, with the balance dependent on securing private capital. That leverage is a scenario, not a committed investment.

Western Australia’s Exploration Incentive Scheme offers a comparison: it can reimburse up to 50% of eligible costs for selected exploration drilling projects. Chile could examine a competitive model with independent technical review, audits, execution commitments and geological data disclosure. Any public contribution would need to demonstrate that it brings in investment beyond what companies had already planned.