San Lorenzo Gold funds Salvadora expansion as Cerro Blanco assays remain pending
Two rigs are testing Cerro Blanco, where visible breccias still need chemical assays to establish their metal content.

Why it matters: Fresh capital gives San Lorenzo Gold room to test multiple targets at Salvadora, but assays must establish whether Cerro Blanco’s observed structures carry meaningful metal values.
C$80,000,320 — gross proceeds from the private placement closed on November 10, 2026
1,818 metres — Cerro Blanco drilling completed as of November 4
513 metres — final depth of hole CB-04-26, against an initial plan of 350 metres
1.5 kilometres — geophysical extension northwest of the San Juan discovery targeted for follow-up drilling
San Lorenzo Gold has closed a C$80,000,320 private placement to expand exploration at its Salvadora gold-copper project in Chile’s Atacama Region, while assay results from its active Cerro Blanco drilling campaign remain pending. The company is operating two diamond rigs at Cerro Blanco and plans to begin drilling at San Juan in December 2026, subject to regulatory and operational preparations.
Cerro Blanco drilling extends beyond initial plans
The company had completed four holes totalling 1,818 metres at Cerro Blanco by November 4. Three holes went deeper than originally planned. Hole CB-04-26 reached 513 metres, compared with a planned depth of 350 metres, extending the investigation of structures at depth.
Drilling has progressed from a platform about 350 metres east of historical hole SAL-04-25 to a second platform 250 metres farther north. Geological logging identified intrusive rocks and zones interpreted as hydrothermal breccias. Those observations may help explain fluid pathways, but they do not establish metal grades: chemical analyses are needed to determine the concentrations present in the core.
The first samples were sent to a specialist laboratory in Santiago on October 24, with a second batch received on November 6. The company said results will inform subsequent exploration decisions.
San Juan is next in the drilling sequence
At San Juan, previous drilling returned gold-bearing intervals associated with geophysical anomalies. Hole SAL-10-25 intersected 102.3 metres at 1.33 g/t gold and 52.6 metres at 1.67 g/t; SAL-09-25 returned 58.5 metres at 1.07 g/t and 60.3 metres at 1.01 g/t. The source material does not specify whether these intervals represent true widths.
The planned campaign will test a geophysical extension about 1.5 kilometres northwest of the discovery area and investigate whether mineralized zones continue into the new anomalies. San Lorenzo is preparing a drilling notification for Chile’s National Geology and Mining Service (Sernageomin), alongside platform construction and operational work. The start is planned for December, conditional on those steps.
Placement funds a multi-target programme
The private placement issued 15,094,400 ordinary shares at C$5.30 each. Commissions and fees, excluding taxes, totalled C$4,771,519. SCP Resource Finance and National Bank Financial led the financing, with BMO Nesbitt Burns and Haywood Securities participating. At closing, the transaction remained subject to final acceptance by the TSX Venture Exchange.
San Lorenzo said proceeds will support drilling, technical studies, infrastructure, operational capacity and working capital. The company wholly owns Salvadora, a roughly 12,000-hectare property about 15 kilometres from Codelco’s El Salvador copper-gold operation. Its 18-to-24-month exploration planning also covers targets including Caballo Muerto, Arco de Oro, Tres Amigos, 24K, Quebrada Salada and Rubí.
The financing supports exploration rather than mine construction. At San Juan, the reported intervals justify further investigation but do not establish an economic resource or reserve. The next technical tests are the pending Cerro Blanco assays and, if regulatory and site preparations are completed, the planned San Juan drilling.
More in Discoveries
ASX juniors target Nordic metals, but projects face sharply different hurdles
Finland's defined resources sit alongside targets whose next phase still depends on permits, partners or untested ground.
Solis Minerals' first Cucho hole logs copper-molybdenum sulphides, with assays pending
The 496.7-metre hole points to possible extensions east and at depth, but visual logging cannot establish grade or economic continuity.
Marimaca hits 102 metres at Pampa Medina as copper-silver continuity remains unproven
Near-surface oxides and deeper sulphides occur in the same exploration area, but their geometry and processing routes still need to be established.



