Metro de Santiago power works reach 85%, but Línea 7 still needs an underground link
At Cerro Navia, high-voltage equipment is being integrated before crews connect the substation to the new railway tunnel.
At Cerro Navia, high-voltage equipment is being integrated before crews connect the substation to the new railway tunnel.