Antofagasta AI campus draws 21 power responses, but no supplier is chosen
A 50 MW starting load would run continuously in a solar-rich region, putting storage and grid backup at the centre of the design.
A 50 MW starting load would run continuously in a solar-rich region, putting storage and grid backup at the centre of the design.