E3 Lithium starts Clearwater scale-up tests as commercial design moves into 2027
The Alberta pilot has produced more than 80,000 cubic metres of brine, but its next equipment configuration must provide data for plant design.
The Alberta pilot has produced more than 80,000 cubic metres of brine, but its next equipment configuration must provide data for plant design.