Global X sees AI growth colliding with long lead times for new mines
A one-gigawatt AI facility could need 27,212 tonnes of copper, alongside demand from power grids, electric vehicles and defence.
A one-gigawatt AI facility could need 27,212 tonnes of copper, alongside demand from power grids, electric vehicles and defence.